Lean Design Forum - Lean Construction Institute & Project Production System Laboratory

LCI Design Forum

The Lean Design Forum of LCI was formed to -

• Develop evidence for the benefits of investing in design; benefits for customers, designers and all stakeholders, including society.

• Develop means for executing design to increase return on investment.

• Promote beneficial practices in the construction industry.

LCI's role in the Design Forum is to:

· Collect and analyze data from experiments.

· Serve as benchmarking center.

· Promote changes in industry practice.

The investigation will focus on that part of a project between the big phases of a construction project: Plan-Design-Build. The handoffs between these phases limit Design to whatever takes place in and between schematic design and the production of fabrication and installation instructions. The Forum also includes in its scope Project Definition as part of Planning--where project feasibility is assessed and objectives are set. Presentations will be delivered by industry practitioners.

Pre-reading preparation for forum: Visit http://www.leanconstruction.org/files/ and review the paper in the Design Forum folder and also review audio and ppt files from previous meetings.


LCI & P2SL Members: $350.00

Guest of Members: $350.00

Non-members: $550.00

Full time Academic and Students: $200.00

If you need assistance registering online, contact registration-support@leanconstruction.  Refund policy: Refunds requested less than 1 week before meeting subject to $50 penalty.

Meeting time: Meetings begin each day at 8:00 am and conclude on the first day at 5:00 pm and 12:00 pm on the second day. The registration fee includes the predinner, a continental breakfast and lunch for all attendees forum materials and handouts and afternoon break.

Dress: Dress is business causal; slacks, sport shirts. Bring a light jacket or sweater as we cannot always control the temperature in the meeting room.


6/18/08 8:00 am - 5 pm.

6/19/08 8:00 am - 12:00 noon.

Meeting Location:

Hilton St. Louis at the Ballpark

One South Broadway @ Market Street

St. Louis, Missouri, United States 63102

Tel: (314) 421-1776


June 17, Wednesday, Evening Informal dinner: Gather in the Hilton Lobby for dinner at 6:30 p.m.

June 18, Thursday, Evening Informal dinner: Gather in the Hilton Lobby for dinner at 6:30 p.m.

Hotel Accommodations -

To make reservations - call 1 - 877-845-7354 - - reference Lean Construction Institute - room block pirce will only be available until May 28, 2008. After that date the rooms are on a space available basis. Group Name: Lean Construction


Sleeping room rate: $139.00 plus applicable taxes

Group Name: Lean Construction

Design Forum Agenda
June 18
7:30 Breakfast and registration
8:00 Start Up
8:15 Lean and IPD-a panel moderated by Markku Allison, AIA
10:00 Break
10:20 An Update on Target Value Design-Glenn Ballard, P2SL
12:00 Lunch
1:00 Virtual Design & Construction-a panel moderated by Dean Reed, DPR
2:45 Break
3:05 Learning about Design Management on CPR [or a design firm presentation on how they’re applying lean in their work]
4:50 Wrap Up
5:00 Adjourn
6:30 Dinner at location

June 19
7:30 Breakfast and registration
8:00 Start Up
8:10 Managing Work Flow in Design-Glenn Ballard, P2SL
9:50 Break  
10:10 Changes in Roles with Integrated Project Delivery: Panel moderated by Sam Spata, HOK
11:50 Wrap Up
12:15 Adjourn
-Offers, requests & commitments
-Planning for next meeting

If you need assistance registering online, send an email to Johna Clark jgclark@leanconstruction.org or call (830) 997-0422 to request an invoice.

Name Sales End Price Fee
LCI & P2SL Members   Ended $350 $7
Member Guest Ended $350 $
Non-Member   Ended $550 $
Full time Academic & Students Ended $200 $
One-Year Individual LCI Membership Ended $200 $4
One - Day Registration Fee for Design Forum Ended $175 $3.5

On the Web

LCI-P2SL Lean Design Forum - June 2011 Tickets at …

Lean Design Forum - June 2011 June 9-10, 2011 Presented by Lean Construction Institute And Project Production System Laboratory (P 2 SL) Join us for 2 days of …


David Kirby | LinkedIn

David managed design and construction of the ... facility Rutherford Appleton Laboratory, and was Project Director for a separate ... Construction; Lean ...


HKS Architects - The 3Ps of Lean Design

... Berkeley Project Production Systems Laboratory (P2SL), the Lean ... lean construction, Lean Design Forum, ... design, lean processes, lean project ...


Iris D. Tommelein (tommelein@ce. berkeley .edu) | …

... helping professionals like Iris D. Tommelein (tommelein@ce.berkeley ... Project Production Systems Laboratory ... of the Lean Construction Institute.


Calendar of Events

Lean Construction Institute ... Lean Design and Construction is a production management based approach to project delivery ... LCI_P2SL_AIA Lean In Design Forum ...


P2SL-LCI Lean Design Forum 2010 | Summary | …

UC Berkeley's Project Production Systems Laboratory (P 2 SL) and the Lean Construction Institute (LCI) are co-hosting the Lean Design Forum, which meets …


AGC Lean Construction Forum

... AGC's Lean Construction Forum began to create an ... content contained in this Lean Design and Pre-construction ... Lean Construction Institute ...


Lean Construction Institute - Arlington, Virginia ...

Lean Construction Institute’s ... aims to extend to the construction industry the Lean production ... Are you going to be at the Lean in Design Forum?


Glenn Ballard | LinkedIn

... helping professionals like Glenn Ballard discover inside connections to ... Lean Construction Institute; ... P2SL Project Production Systems Laboratory at UC ...


Lean Design and Construction Project an Extension of Lean …

Lean Design and Construction Project an Extension of ... called Integrated Lean Project Delivery System ... Lean Enterprise Institute and the leaper image ...


Lean Project Delivery - Project Production Systems ...

Lean Project Delivery. ... Adoption of this technique promise to help the construction industry raise the number ... Project Production Systems Laboratory P 2 SL ...


Our Team | Lean Project Consulting

Klaus Lemke Managing Principal. Klaus is the Managing Principal of Lean Project Consulting. His expertise spans all aspects of project design and construction, with …


Lean construction - lcinm

Lean construction production system design resists the ... The Lean Construction Institute conducts ... Project Production Systems Laboratory at the ...


An Article about Lean Design and Construction for ...

... that other hospital’s leadership pushed back and educated the architects about why their Lean design ... Lean Construction Institute ... lab design is a big ...


Lean Construction Institute PDF ( 81 PDF Ebooks )

Educative Newsletter No.4 Ambience for Lean Construction INSTITUTE FOR LEAN ... Lean Construction Institute Academic Forum ... PRODUCTION SYSTEM DESIGN IN CONSTRUCTION


Lean Design Forum - Lean Construction Institute & Project …

... presents Lean Design Forum - Lean Construction Institute & Project ... Lean Construction Institute & Project Production System Laboratory Lean ...


LCI-P2SL Lean Design Forum - June 2010 in Kansas City, …

LCI-P2SL Lean Design Forum - June 2010 on Jun 15, 2010 in Kansas City, MO at Postal code 64108, US. LEAN DESIGN FORUM - JUNE 2010June 15-16, ...


Lean Delivery | Pankow

Pankow is an active member of the Lean Construction Institute ... in the design, engineering and construction of ... (Project Production Systems Laboratory) ...


lean construction : definition of lean construction and ...

Lean construction production system design resists the ... and Lean Construction? Lean production is the ... Project Production Systems Laboratory ...


Lean Construction Opportunities Ideas Practices …

... of the Lean Construction Institute, ... construction, production system design coupled with ... really collaborate” is a prerequisite for Lean Project ...


Related Events